Best Solutions Generated here

The priority in the work of the BSG Technology LLP is implementation of environmental projects aimed at the introduction of innovative, energy-saving materials and technologies

List of main projects on processing of oil-containing waste and cleaning of tanks in the territory of Qazaqstan

Project 2005-2022. “Ozenmunaygaz” JSC. Treatment of oil-containing emulsion. Zhanaozen city1 210 400 m3

Project 2008-2022. “Mangystaumunaygaz” JSC. Treatment of oil-containing emulsion. Zhetybay city79 857 m3

Project 2015. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen city200m3 tank

Project 2016. “Maersk Oil Kazakhstan GmBH” LLP. Industrial Cleaning. Aktau cityOil separator 50 m3Oil separator 25 m3Air receiver 17.6 m3Drain vessel 12.5 m3Flare knockout drum 5 m3Formation water separator 50 m3Flare knockout drum 4 m3

Project 2016. NSK “Neftyanaya Servisnaya Kompaniya” LLP. Industrial Cleaning. Aktau cityOil separator 50 m3

Project 2017. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen cityOil tank 20 000 m3

Project 2018. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen cityOil tank 5 000 m3 - 2 pcs

Project 2020. “Norilsk-Taimyr Energy Company” JSC. Separation of the diesel-water mixture. Norilsk city3000 m3

Project 2020-2021. “Atyrau oil refinery” LLP. Treatment of oil-containing emulsion. Atyrau city48 321 m3

List of main projects on water treatment in RoK

Project 2014. WWTP in Astana city – Mechanical sludge dewatering workshop N1 Astana city2 pcs. Of decentering centrifugescapacity 120 m3/h

Project 2014. WWTP in Astana city – Mechanical sludge dewatering workshop N1 Astana city3 pcs. Of decentering centrifugescapacity 105 m3/h

Project 2017. WWTP Astana city - Mechanical sludge dewatering workshop N1 Petropavlovsk city3 pcs. Of decentering centrifugescapacity 105 m3/h

Contacts