Best Solutions Generated here

The priority in the work of the BSG Technology LLP is implementation of environmental projects aimed at the introduction of innovative, energy-saving materials and technologies

List of main projects on processing of oil-containing waste and cleaning of tanks in the territory of Qazaqstan

Project 2005-2022. “Ozenmunaygaz” JSC. Treatment of oil-containing emulsion. Zhanaozen city 1 210 400 m3

Project 2008-2022. “Mangystaumunaygaz” JSC. Treatment of oil-containing emulsion. Zhetybay city 79 857 m3

Project 2015. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen city 200m3 tank

Project 2016. “Maersk Oil Kazakhstan GmBH” LLP. Industrial Cleaning. Aktau city Oil separator 50 m3 Oil separator 25 m3 Air receiver 17.6 m3 Drain vessel 12.5 m3 Flare knockout drum 5 m3 Formation water separator 50 m3 Flare knockout drum 4 m3

Project 2016. NSK “Neftyanaya Servisnaya Kompaniya” LLP. Industrial Cleaning. Aktau city Oil separator 50 m3

Project 2017. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen city Oil tank 20 000 m3

Project 2018. “Ozenmunaygaz” JSC. Industrial Cleaning. Zhanaozen city Oil tank 5 000 m3 - 2 pcs

Project 2020. “Norilsk-Taimyr Energy Company” JSC. Separation of the diesel-water mixture. Norilsk city 3000 m3

Project 2020-2021. “Atyrau oil refinery” LLP. Treatment of oil-containing emulsion. Atyrau city 48 321 m3

List of main projects on water treatment in RoK

Project 2014. WWTP in Astana city – Mechanical sludge dewatering workshop N1 Astana city 2 pcs. Of decentering centrifuges capacity 120 m3/h

Project 2014. WWTP in Astana city – Mechanical sludge dewatering workshop N1 Astana city 3 pcs. Of decentering centrifuges capacity 105 m3/h

Project 2017. WWTP Astana city - Mechanical sludge dewatering workshop N1 Petropavlovsk city 3 pcs. Of decentering centrifuges capacity 105 m3/h

Contacts